In April 2018, South Jersey Gas (SJG) mobilized for the current phase of remediation at the Pleasantville former Manufactured Gas Plant (MGP) Site in Pleasantville, New Jersey. The Site is located at the intersection of North Franklin Boulevard and Old Turnpike. It is anticipated that activities will take approximately 14 months to complete.

South Jersey Gas is committed to open communications with community leaders, government officials, residents and local businesses. For more information on the project, visit http://pleasantvillemgp.com/. For questions or concerns, please call the project information line at (609) 833-2810 or email us at comments@pleasantvillemgp.com.

Locations of 2019 Project Stages

Stage 1A: South of Old Turnpike, East of North Franklin, North of Grant

Stage 2: South of Old Turnpike, West of North Franklin, North of Grant

Anticipated Work to be performed: April 15-19

Site Activity

  • Continue ISS (in-situ stabilization, or the use of stabilization constituents to contain materials onsite) within Franklin Blvd.
  • Continue ISS (in-situ stabilization, or the use of stabilization constituents to contain materials onsite) within Old Turnpike.
  • Load out soil for offsite thermal treatment and beneficial reuse.
  • As necessary, continue efforts to mitigate odors naturally associated with MGP materials, including foaming, maintaining fixed perimeter odor-neutralizing granule system, and conducting daily odor assessment patrols.
  • As necessary, continue water misting to reduce dust.
  • Continue air monitoring at site perimeter.
  • Continue onsite security (weekdays: 4 p.m. – 7 a.m. and Sat/Sun: 24-hrs.).

Work performed: April 8-12

Site Activity

  • Relocated rig back to Franklin Blvd.
  • Continued ISS (in-situ stabilization, or the use of stabilization constituents to contain materials onsite) within Franklin Blvd.
  • Loaded out soil for offsite thermal treatment and beneficial reuse.
  • As necessary, continued efforts to mitigate odors naturally associated with MGP materials, including foaming, maintaining fixed perimeter odor-neutralizing granule system, and conducting daily odor assessment patrols.
  • As necessary, continued water misting to reduce dust.
  • Continued air monitoring at site perimeter.
  • Continued onsite security (weekdays: 4 p.m. – 7 a.m. and Sat/Sun: 24-hrs.).